IN FOCUS: MINISTRY OF EDUCATION
The Bayelsa state ministry of education is headed by the Hon. Commissioner for Education, Hon.Salo Adikumo. This ministry In less than 2 years of the Hon. Dickson's administration have awarded and monitored Over 400 construction projects ranging from Classroom blocks, headmasters quarters, Dormitory, Dinning Halls, Staff quarters, ICT centers etc, across the State.
Below are some of the completed projects by this ministry:
YENAGOA L.G.A.
ST
JUDE’S GIRLS AMARATA.
· ADMINISTRATIVE BLOCK
ST
JUDE’S GIRLS AMARATA.
· HOSTEL BLOCK
ZARAMA
· BOYS HOSTEL BUILDING
(BLOCKS A/B)
KOLOKUMA/OPOKUMA L.G.A.
KAIAMA
· ADMINISTRATIVE BLOCK
KAIAMA
· DINNING HALL
KOLOKUMA/OPOKUMA L.G.A.
SABEGERIA
· BOYS HOSTEL BUILDING (BLOCKS A/B)
SAGBAMA L.G.A.
EBEDEBIRI
· BOYS HOSTEL BUILDING (BLOCKS A/B)
C.O.E
SAGBAMA
· 24 CLASSROOM BLOCKS
C.O.E SAGBAMA
· HOSTEL BUILDING
IIT BOLOU – ORUA
· DINNING HALL BUILDING
IIT BOLOU – ORUA
· TEN CLASSROOOM BLOCK
EKEREMOR L.G.A.
MODEL SECORDARY SCHOOL EKEREMOR
· ICT/LIBRARY
MODEL SECORDARY SCHOOL EKEREMOR
· HOSTEL BLOCK
CLASSROOM BLOCK
EGBEMO ANAGALABIRI
· BOYS HOSTEL BUILDING (BLOCKS A/B)
SOUTHERN IJAW L.G.A.
MODEL SECONDARY SCHOOL
· DINNING HALL BUILDING
OPOROMA
· HOSTEL BUILDING
KOROKOROSEI
· BOYS HOSTEL BUILDING (BLOCKS A/B)
OGBIA L.G.A.
MODEL SECORDARY SCHOOL EKEREMOR
· ADMINISTRATIVE BUILDING
Other ongoing projects on education across the state are;
ONGOING CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL BRASS IN BRASS LGA.
Ongoing Construction of (12) Twelve Classroom Block, Presently at Lintel Level
Contractor: AYAM’S SON & VETUREv Ongoing Construction of (12) Twelve Classroom Block, Presently at Lintel Level
Contractor: MARIE CONCERNSv Ongoing Construction of Hostel Block, Presently at DPC Level
Ongoing Construction of Information Technology Center/library, at Roofing Level
Contractor: BLOSSOM ENTERPRISES.Ongoing Construction of Hostel Blocks, at Roofing Levelv Ongoing Construction of Dinning Hall/kitchen, presently at Roofing Level
Contractor: GMI INTERNATIONAL CONSTRUCTION & AFFAIRS CO.
ONGOING CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL EGWEAMA IN BRASS LGA.
v Ongoing Construction of (2)L Shape Hostel Block, Presently Roofed with Doors and Windows
v Ongoing Construction of Dinning Hall Presently at Lintel Level
ONGOING CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL OKPOAMA IN BRASS LGA.
v Ongoing Construction of Dinning Hall, Presently at Lintel Level
v Ongoing Construction of L Shape Hostel Block, Presently Roofed with Doors and Windows
v Ongoing Construction of (2)U Shape Hostel Block, Presently Roofed with Doors and Windows
EKEREMOR LOCAL GOVERNMENT AREA
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY PRIMARY SCHOOL EKEREMOR IN EKEREMOR LGA
v Completed Head Master’s Quarters
v Completed Renovation of Classroom Block for Model Primary School
ONGOING CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL EKEREMOR IN EKEREMOR LGA
Ongoing Construction of (1) One Unit of Dinning Hall Ongoing Construction of (1) One Unit of Hostel Block, presently Undergoing Painting. Ongoing Construction of (12) Twelve Classroom Block, Presently not Painted Ongoing Construction of (1) One Unit of Hostel Block, Presently at Roofing Level Completed, (1) One Unit of Hostel Block Completed Administrative Block
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY PRIMARY SCHOOL ISAMPOU IN EKEREMOR LGA
v Completed Head Master’s Quarters
v Renovation of Classroom Block, Completed
v Renovation of Classroom Block, Completed
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY SECORDARY SCHOOL ALEIBIRI IN EKEREMOR LGA (CONSTITUENCY PROJECT)
v Ongoing Construction of Dinning Hall and Kitchen ,Presently at Roofing level
v Ongoing Construction of (2) Two Hostel blocks
Block (A) has been plastered, Roofed but without Doors and WindowsBlock (B) still at window Levelv Ongoing Construction of Hostel Block (C)
KOLOKUMA LOCAL GOVERNMENT AREA
ONGOING CONSTRUCTION OF PROJECTS AT GOVERNMENT SECONDARY SCHOOL ODI IN KOLOKUMA LGA.
v Completed (2) L Shape
Hostel Block.
v Ongoing Construction of L
Shape Hostel Block. Presently been Roofed
ONGOING CONSTRUCTION OF PROJECT AT IGBEITA PRIMARY SCHOOL ODI IN KOLOKUMA LGA.
v Completed Head Master’s Quarters
v Completed Classroom Block.
v Completed Classroom Block (2)
ONGOING CONSTRUCTION OF PROJECT AT MODEL SECONDARY SCHOOL KAIAMA IN KOLOKUMA LGA.
v Completed Dinning Hall Block, Contractor: DON AMAKIRI ENTERPRISES
v Ongoing Construction of Hostel Block (a)
v Ongoing Construction of Hostel Block (b)
v Ongoing Construction of information Technology Center
v Ongoing Construction of Administrative Block
v Ongoing Construction of Hostel Block (c)
ONGOING CONSTRUCTION OF PROJECT AT REV PROCTOR MEMORIAL III SCHOOL KAIAMA IN YENAGOA LGA.
Completed Classroom Block
NEMBE LOCAL GOVERNMENT AREA
ONGOING CONSTRUCTION OF PROJECTS AT STATE PRIMARY SCHOOL AGBAKABIRIYAI IN NEMBE LGA.
Completed Information Technology Centre Renovated Classroom Block, Completed Ongoing Renovation of Classroom Block, Presently at Roofing level
ONGOING CONSTRUCTION OF PROJECT AT STATE PRIMARY SCHOOL ALAGOA TEREKE IN NEMBE LGA.
Ongoing Construction of Information Technology Centre, Roofing level
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY SECONDARY SCHOOL EGBEWOAMA IN NEMBE LGA.
Ongoing Construction of Information Technology Centre, Roofed
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY PRIMARY
Completed Head Master’s Quarters
Renovated Classroom Block. Completed
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY PRIMARY SCHOOL IBO IN NEMBE LGA
.v Completed Information Technology Center.
Renovated Classroom Block, Completed
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY BOYS SECONDARY SCHOOLBASSAMBIRI IN NEMBE LGA.
Ongoing Construction of (2) U shape Hostel Block, Presently, Roofed plastered. Ongoing Construction of Classroom Block, at Roofing Level. Ongoing Construction of Dinning Hall Ongoing Construction of Hostel Block presently at Roofing level
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY PRIMARY SCHOOL NENBE CREEK IN NEMBE LGA.
Completed Head Master’s Quarters
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY PRIMARY SCHOOL OGBOLOBABIRI IN NEMBE LGA.
v Completed Information Technology Center
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY PRIMARY SCHOOL OGBOLOBABIRI IN NEMBE LGA.
v Completed Head Master’s Quarters
v Completed Renovation of Classroom Block. Contr.: AYENMA & SONS VENT
ONGOING CONSTRUCTION OF PROJECT AT MODEL SECONDARY SCHOOL OGBOLOBABIRI IN NEMBE LGA.
v Completed Classroom block.
v Ongoing Construction of (2) Two Storey Hostel Block, Presently at Roofing Level
v Ongoing construction of science laboratory
v Renovation of Staff Quarters completed
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY SECONDARY SCHOOL OLOGOAMA IN NEMBE LGA.
v Ongoing Construction of (2) U Shape Hostel Blocks
v Ongoing Construction of Dinning hall
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY PRIMARY SCHOOL SONKIRI IN NEMBE LGA.
v Completed Information Technology Center.
Completed Renovation of Classroom Block.
OGBIA LOCAL GOVERNMENT AREA
ONGOING CONSTRUCTION OF PROJECTS AT GOVERNMENT SECONDARY SCHOOL ANYAMA-OGBIA IN OGBIA LGA.
v Ongoing Construction of Dinning Hall/kitchen, Presently at Lintel Level
Contractor: ASTIKE GLOBAL INDUSTRIAL COMPANY
v Ongoing Construction of L Shape Hostel Block. At window level
v Ongoing Construction of (2)Two L Shape Hostel Block. Has been Roofed
v Ongoing Construction of Classroom Block, been Roofed
v Ongoing Construction of Hostel Block, Presently Roofed
v Ongoing Construction of Hostel Block, Presently been Roofed
v Ongoing Construction of Hostel Block Presently Roofed
v Completed Head Master’s Quarters
v Ongoing Construction of Head Master’s Quarters completed but not Painted
ONGOING CONSTRUCTION OF PROJECTS AT MODEL SECONDAY SCHOOL OTAKEME IN OGBIA LGA.
v Ongoing Construction of Dinning Hall, Presently at DPC Level
Ongoing Construction of (2) U shape Hostel Blocks, Presently been RoofedONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY PRIMARY SCHOOL EMEYAL IN OGBIA LGA.
v Completed Head Master’s Quarters
v Completed Renovation of Classroom Block
v Completed Information Technology Center
ONGOING CONSTRUCTION OF PROJECTS AT MODEL SECONDAY SCHOOL OTUESIGA IN OGBIA LGA.
v Ongoing Construction of L shape Hostel Block, Presently Roofed.
v Ongoing Construction of (2) L shape Hostel Blocks, Presently Roofed.
v Ongoing Construction of Dinning Hall, Presently at DPC Level
v Completed Head Master’s Quarter.
v Completed Head Master’s Quarter.
ONGOING CONSTRUCTION OF PROJECTS, AT MODEL SECONDARY SCHOOL TOWN IN SAGBAMA.
v Ongoing Construction of Administrative Block
v Ongoing Construction of Hostel Block
v Ongoing Construction of Dinning Hall
v Ongoing Construction of Information Technology Center
v Ongoing Construction of Hostel Block (1)
ONGOING CONSTRUCTION OF PROJECTS, AT MODEL SECONDARY SCHOOL TOWN IN SAGBAMA.
ONGOING
CONSTRUCTION OF PROJECTS, AT TEACHERS TRAINING INSTITUTE (TTI) BOLOU-ORUA IN SAGBAMA.
v Renovation of Classroom Block, has been
Completed
v Renovation of Science Laboratory, has been
roofed but not painted, Doors and Windows has been changed.
v Ongoing Construction of Dinning Hall,
Roofed, But has not been plastered, without Doors and Windows
v Ongoing Construction of 25 Rooms Hostel
Blocks at various stages of completion, The total number on Site are (4)
four
v A Completed,(10) Ten
Classroom Block, (1) One storey Building
v Ongoing Renovation of Staff
Quarters
ONGOING
CONSTRUCTION OF PROJECTS, AT TEACHERS TRAINING INSTITUTE (TTI) BOLOU-ORUA IN SAGBAMA.
v Renovation of Classroom Block, has been
Completed
v Renovation of Science Laboratory, has been
roofed but not painted, Doors and Windows has been changed.
v Ongoing Construction of Dinning Hall,
Roofed, But has not been plastered, without Doors and Windows
v Ongoing Construction of 25 Rooms Hostel
Blocks at various stages of completion, The total number on Site are (4)
four
v A Completed,(10) Ten
Classroom Block, (1) One storey Building
v Ongoing Renovation of Staff
Quarters
ONGOING
CONSTRUCTION OF PROJECTS AT COMMUNITY SECORDARY SCHOOL BOLOU – ORUA IN SAGBAMA
v Construction of Science
Laboratory , Presently at Roofing Level
v Completed (6) Classroom
block
v Completed Renovation of Classroom block
ONGOING
CONSTRUCTION OF PROJECTS AT COMMUNITY SECORDARY SCHOOL BOLOU – ORUA IN SAGBAMA
v Construction of Science
Laboratory , Presently at Roofing Level
v Completed (6) Classroom
block
v Completed Renovation of Classroom block
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY SECORDARY SCHOOL EBEDEBIRI IN SAGBAMA
v Completed, (2) Two Hostel blocks in Ebedebiri
v Ongoing Construction of model primary school with, (10) Classroom, Head Masters office, Staff Room, ITC/Library.
ONGOING CONSTRUCTION OF PROJECTS AT ISAAC JASPER BORO COLLEGE OF EDUCATION IN SAGBAMA
v Completed Classroom Block
v Completed Administration Block
v Renovation of Staff Quarters
v Ongoing Construction of Classroom Block.
v Completed ICT /Library.
v Ongoing Construction of (1) One Storey Hostel Block.
Contractor: OYINKE & SONS ENT.
v Ongoing Construction of (1) One Storey Hostel Block.
Contractor: ORAK ENTERPRISE
v Ongoing Construction of (1) One Storey Hostel Block.
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY PRIMARY SCHOOL ANYAMA IN SOUTHERN IJAW LGA.
v
Ongoing Construction of Head Master’s Quarter. Been Roofed
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY PRIMARY SCHOOL ANYAMA IN SOUTHERN IJAW LGA.
Ongoing Construction of Head Master’s Quarter. Been Roofed
Completed Head Master’s Quarter
v Ongoing Construction of (2) Two L Shape Hostel blocks Completed but not Painted.
v Ongoing Construction of L Shape Hostel blocks, Roofed
v Completed Renovation of Classroom Block.
Ongoing Construct ion of Classroom Blocks ,Presently at Roofing Level
Ongoing Construction of L Shape Hostel Block, Completed but not painted
ONGOING CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL OPOROMA IN SOUTHERN IJAW LGA.
v Ongoing Construction of Administrative Block.
v Ongoing Construction of (2) Two L Shape Hostel Blocks.
v Ongoing Construction of Classroom Block.
v Ongoing Construction of Information Technology Center /Library..
v Ongoing Construction of Classroom Block.
v Completed Dinning Hall
ONGOING
CONSTRUCTION OF PROJECT AT ST BARNABA’S PRIMARY SCHOOL UKUBIE IN SOUTHERN IJAW
LGA.
v Completed Head
Master’s Quarters
CONTRACTOR: ISRAEL OGONA & SONS ENTERPRISES
ONGOING
CONSTRUCTION OF PROJECT AT ST BARNABA’S PRIMARY SCHOOL UKUBIE IN SOUTHERN IJAW
LGA.
v Completed Head
Master’s Quarters
CONTRACTOR: ISRAEL OGONA & SONS ENTERPRISES
ONGOING
CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL ENIWARI IN SOUTHERN IJAW LGA.
v Ongoing Construction of L
Shape Hostel Block, Completed but not painted.
ONGOING
CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL OPOROMA IN SOUTHERN IJAW LGA.
v Ongoing Construction of Administrative
Block.
v Ongoing Construction of
(2) Two L Shape Hostel Blocks.
v Ongoing Construction of
Classroom Block.
v Ongoing Construction of
Information Technology Center /Library..
v Ongoing
Construction of Classroom Block.
v Completed Dinning
Hall
YENAGOA LOCAL GOVERNMENT AREA
ONGOING CONSTRUCTION
OF PROJECTS AT COMMUNITY PRIMARY SCHOOL AZIKORO IN YENAGOA LGA. CONTRACTOR: GIANI GLOBAL SERVICES
v Completed Head Master’s Quarters
v Renovation of Classroom Block, Completed
ONGOING CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL ENIWARI IN SOUTHERN IJAW LGA.
v Ongoing Construction of L
Shape Hostel Block, Completed but not painted.
ONGOING
CONSTRUCTION OF PROJECTS AT MODEL SECONDARY SCHOOL OPOROMA IN SOUTHERN IJAW LGA.
v Ongoing Construction of Administrative
Block.
v Ongoing Construction of
(2) Two L Shape Hostel Blocks.
v Ongoing Construction of
Classroom Block.
v Ongoing Construction of
Information Technology Center /Library..
v Ongoing
Construction of Classroom Block.
v Completed Dinning
Hall
YENAGOA LOCAL GOVERNMENT AREA
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY PRIMARY SCHOOL AZIKORO IN YENAGOA LGA. CONTRACTOR: GIANI GLOBAL SERVICES
v Completed Head Master’s Quarters
v Renovation of Classroom Block, Completed
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY PRIMARY SCHOOL ETEGWE IN YENAGOA LGA.
v Completed Head Master’s Quarters
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY SECONDARY SCHOOL FAMGBE IN YENAGOA LGA. (Constituency Project)
v Ongoing Construction of (2) L Shape Hostel Blocks.
v Ongoing Construction of Dinning Hall.
ONGOING CONSTRUCTION OF PROJECTS AT COMMUNITY PRIMARY SCHOOL OKOLOBIRI IN YENAGOA LGA.
v Ongoing Construction of (2) L Shape Hostel Blocks.
v Ongoing Construction of Dinning Hall
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY PRIMARY SCHOOL KPANSIA IN YENAGOA LGA.
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY PRIMARY SCHOOL OKUTUKU IN YENAGOA LGA.
v Completed Head Master’s Quarters
ONGOING CONSTRUCTION OF MODEL SECONDARY SCHOOL AT ST JUDE’S GIRLS SECONDARY SCHOOL, AMARATA.
v Completed Administrative Block
v Ongoing Construction of Classroom Block
v Ongoing construction of hostel block (A)
v Ongoing construction of hostel block (B)
v Ongoing construction of dining hall, Presently at Roofing Level (Steel Roof)
ONGOING CONSTRUCTION OF PROJECT AT COMMUNITY SECONDARY SCHOOL ZARAMA IN YENAGOA LGA.
v Ongoing Construction of (2) L Shape Hostel Blocks.
v Ongoing Construction of Dinning Hall.
v Ongoing Construction of L Shape Hostel Block.
Compiled by
Matilda Angaye
Matilda Angaye